PLANNING
|
|
Zoning Map Change
|
$328
|
Annex Review - Uninhabited
|
$328
|
Annex Review - Inhabited
|
$328
|
CUP Residential
|
$328
|
CUP Site Approval
|
$328
|
Minor Deviation
|
$328
|
Variance
|
$328
|
Variance w/ other application
|
$328
|
Minor Mod. Administrative
|
$328
|
Pre-Development Review
|
$328
|
Special Development Review
|
$328
|
Parcel Map </= 4 lots
|
$328
|
Tract Map SFR
|
$328
|
Major Modification / Time Ext.
|
$328
|
Major Modification / Time Ext./ Staff
|
$328
|
Deferred Improvement Agmt
|
$328
|
Lot Merger
|
$328
|
|
|
INSPECTIONS
|
|
Hazard Inspection
|
$328
|
Hazard Abatement + actual
|
$328
|
Hazardous Trees Inspection
|
$328
|
Special Inspection
|
$328
|
Fire Second + Inspection
|
$190
|
Day Care Inspection
|
$328
|
Elderly Care Inspection
|
$328
|
Apartment Inpsections 3-10 Units
|
$328
|
Motel / Hotel Inspections
|
$328
|
Other State Inspections
|
$328
|
Apartment Inpsections 11- 40 units
|
$396
|
Apartment Inspections 40+ units
|
$465
|
Resale Inspections
|
$190
|
|
|
OPERATIONAL
|
|
Amusement Building
|
$328
|
Carnival / Fair
|
$602
|
Temporary Special Use
|
$328
|
Compressed Gases
|
$328
|
Covered Mall Building
|
$328
|
Cryogenic Fluids
|
$328
|
Welding / Cutting Operations
|
$328
|
Dry Cleaning Plant
|
$328
|
Exhibit / Trade Show
|
$328
|
Explosives
|
$328
|
Fireworks Permit
|
$328
|
Flammable & combustible Liquids
|
$328
|
Floor Finishing
|
$328
|
Hazardous Materials Operations
|
$328
|
High Piled Storage
|
$328
|
Hot Work Operations
|
$328
|
Lumber Yard Operations
|
$328
|
Liquid gas operations in assemblies
|
$328
|
LP Gas Storage
|
$328
|
Misc. Combustible Storage
|
$328
|
Open Burning Permit
|
$328
|
Open Flames & Torches
|
$328
|
Open Flames & Candles
|
$328
|
Assembly Occupancy permit
|
$328
|
Pyrotechnic/Special effects
|
$328
|
Repair Garage / Fuel Dispensary
|
$328
|
Spraying or Dipping Operations
|
$328
|
Tire Storage Operations
|
$328
|
Temp. Tents/ Canopies/ Mem Structure
|
$328
|
Waste Handling Operations
|
$328
|
Wood Product production permit
|
$328
|
General Use Permit /Inspection
|
$328
|
Aircraft Refueling Permit
|
$328
|
Auto Wrecking Yard
|
$328
|
Cellulose Nitrate Storage
|
$328
|
|
|
CONSTRUCTION
|
|
Fire Protection Plan
|
$369
|
Vegetation Management Plan
|
$396
|
Sprinkler System, Commercial New
|
$671
|
Sprinkler System, Commercial Imp. 0-25
|
$396
|
Sprinkler System, Commercial Imp. 26-99
|
$534
|
Sprinkler System, Commercial Imp. 100+
|
$671
|
Sprinkler System, Res. >5000 sqft
|
$602
|
Sprinkler System, Res. < 5000 sqft
|
$534
|
Auto. Fire Suppression System
|
$396
|
Battery Systems
|
$465
|
Compressed Gas operations permit
|
$465
|
Cryogenic Fluid Operational Permit
|
$465
|
Emergency Responder Radio System
|
$465
|
Fire Alarm / Det. System
|
$534
|
Fire Pumps & Systems
|
$534
|
Flammable & combustible Liquids pipeline
|
$602
|
Flammable & combustible liquids facilities
|
$602
|
Flammable & combustible liquids tanks
|
$602
|
Hazardous Materials Large system
|
$602
|
Industrial Oven Permit
|
$602
|
LP Gas Storage modification
|
$602
|
Private Fire Main / Hydrant
|
$602
|
Photovoltaic Power System
|
$328
|
Spraying & Dipping Permit
|
$602
|
Alternate Materials & Methods review
|
$417
|
Building Permit (minimum $328.00) 30%
|
|
Standpipe System
|
$602
|
Co Permit Temp. Membrane / Tent
|
$328
|
Co Permit Temp. Membrane / Tent . 1500 Sqft
|
$602
|
Expedited Plan Review
|
$412
|
Code Interpretation
|
$160
|
Plan Resubmittal
|
$190
|
Veg. Management Livestock permit
|
$328
|
Fire Alarms Sytem modification
|
$328
|
Expired Permit Re-activation
|
1/2 Current Fee
|
|
|
ADMINISTRATION
|
|
Work without permit
|
Double the Permit Fee
|
False Alarms after 2nd
|
Actual Cost
|
Surcharge Fee
|
Actual Cost
|
Hydrant Flow
|
$328
|
Appeals Process
|
$1,088
|
Fire Standby Permit + Actual
|
Actual Cost
|
Vegetation Removal + Actual
|
Actual Cost
|
Fumigation Response
|
Actual Cost
|
Recovery of Costs for Suppression/Investigation
|
Actual Cost
|